Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 6, 2023

December 6, 2023

November 15, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

Multiple Locations, Gering, NE

Subscribe to View Full Documents

The work shall include all labor, materials, transportation, and equipment required for the construction of: Sta. 77+85 C007922815L (Phase A): Rehabilitation Existing Structure by Removing and Replacing Bridge Deck, Replace Adjacent Roadway and Sidewalks, and Install Waterproofing Membrane and Asphalt Overlay. Sta. 1077+85 C007922815R (Phase B): Rehabilitation Existing Structure by Deck Patching and Joint Replacement and Install Waterproofing Membrane and Asphalt Overlay. Copies of the Bid Documents and Specifications are on file and open to public inspection at the following locations: o Speece Lewis Engineers, Inc., 906 S 26 th Street, Lincoln NE 68510 o Scotts Bluff County Highway Superintendent Office, 785 Rundell Road, Gering NE 69341 Proposals must be signed and submitted on the forms furnished with the Bid Documents. PLEASE ONLY SUBMIT DIVISION 5. Each bidder will be required to submit with his proposal a Bid Bond or Certified Check made payable, without condition, to the County Treasurer of Scotts Bluff County, Nebraska, in an amount equal to five (5) percent of their proposal. The bidder to whom the contract is awarded shall furnish within ten (10) days after the award a surety bond or bonds in a sum equal to the full amount of the contract. The form of the bonds and surety shall be acceptable to the Scotts Bluff County Board of Commissioners. The bidder will include an estimated time of beginning and completion for the project with the proposal. The Contractor will be allowed two-hundred and seventy (270) calendar days for the completion of the project. The required completion date of the project is November 15, 2025. The Scotts Bluff Board of County Commissioners reserves the right to reject any and all bids, to pass upon the regularity, and to waive any irregularities. Awarding of the Contract will be in accordance with the provisions of "Competitive Bidding; Consideration", COUNTY PURCHASING ACT, N.R.S. Sections 23-3101 through 23-3114, any competitive bidding requirements of Nebraska Statutes 16-321, et. seq. The Scotts Bluff County Board of Commissioners will, at their discretion, award the contract based on the lowest or best bid. If you have any questions regarding this information, please contact our office at the following address or telephone number Gregory Hutmacher Speece Lewis Engineers, Inc. 906 S 26th Street Lincoln NE 68510 Phone: (402) 483-5466

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.