Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 4, 2023

August 30, 2024

Multiple Locations

Renovation

No Information to Display

$300,000.00

Public - County

img_map_placeholder

Multiple Locations, Moss Point, MS

Subscribe to View Full Documents

Your firm is invited to submit an offer under seal to Owner for renovations to existing buildings HVAC systems located at Jackson County School District Campuses and indicated below: East Central High School - 5500 Hurley Wade Road, Moss Point, MS 39562 East Central Lower Elementary School - 5621 MS 614, Moss Point, MS 39562 Project Name: East Central HVAC Upgrades Project Number: 0155.23.002 Project Description: This project consists of HVAC systems replacement and associated electrical work as described in the Construction Documents and Specifications. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount or a certified check for a sum no less than 5 percent of the Bid Amount. Refer to other bidding requirements described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information. Bids in excess of $50,000.00 must be marked on the outside of the envelope with the contractor's Mississippi certificate of responsibility number as issued by the Mississippi Board of Contractors. Your offer will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. The Owner reserves the right to accept or reject any or all offers. This project will consist of the following general scope of work. This description is provided for convenience purposes only and shall not be considered all inclusive. It is the general contractor's responsibility to become fully famliar with the existing conditions, review all of the construction document drawings, specifications, and any additional information documents in their entirety and bring forth any and all questions regarding scope confusion, misinterpretations, and/or possible errors and omissions to the Architect and/or Engineer prior to bid submission and/or start of construction. 1. This project consists of HVAC systems replacement and associated electrical work as described in the Construction Documents and Specifications.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects