Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

December 15, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Tuscaloosa, AL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

All questions should be emailed to derrell.calhoun@va.gov by November 10, 2023, by 10:00 AM Eastern Time (ET). All responses to questions shall be incorporated into a written amendment posted to the solicitation. The quoter is encouraged to monitor the solicitations for any amendments. There will be one Site Visit, no individually visits. The contractor shall provide all labor, equipment, tools, materials, supervision, test equipment, travel and transportation necessary to perform annual preventive maintenance and inspections of the diesel generators along with checking the switchgears for each of the eleven (11) listed generators in accordance with current NFPA 99 and NFPA 100 testing and maintenance activities. Inspections shall include, but not limited to, assessing the prime mover's exhaust gas temperature against the minimum temperature recommended by the manufacturer (this information must be on the report) Contractor shall provide a minimum of four (4) continuous hours load bank with at least 30% of the nameplate rating to perform test. During the test, the dummy or load bank must be arranged so that it could be disconnected if power was lost to facility and the generator was needed for Medical Center use. Contractor shall polish the entire diesel fuel tank for each generator. Contractor to provide generator and ATS training manufacturer training. This annual inspection (of the generators, etc.) must be accomplished during the month of January and reports submitted timely. This contract is for a base year with four (4) one year option periods beginning January 1, 2024, through December 30, 2028.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.