Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 21, 2023

December 21, 2023

No Information to Display

Multiple Locations

Remodeling

No Information to Display

$430,000.00

Public - City

img_map_placeholder

Multiple Locations, Findlay, OH

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Description PARKER TRAINING/AIRPORT TERMINAL RESTROOM REMODEL The City of Findlay has recently completed renovation projects at the Parker Training Facility located at 315 South West Street (entrance off West Crawford Street) and the Airport Terminal located at 1205 Lima Avenue. These projects will complete the renovation projects by adding restrooms and removing the existing at the Parker Center and by renovating the restrooms at the Airport Terminal. Work will include all necessary ADA provisions. Engineering Estimate: $ 430,000 Bond Percentage 10.00% Keep full and accurate payroll records available for inspection for up to one (1) year following the completion of the project. Owners/partners must be shown on payrolls for any physical work they perform on the job. A. time records B. payroll records including canceled checks C. fringe benefit records including canceled check Prevailing Wage Determination must be posted on the project site. Supply Findlay Prevailing Wage Coordinator with dates of the life of the contract and a listing of all subcontractors to include the name, address, and telephone number of each. Supply each employee with written notification of his assigned job classification, hourly prevailing wage rate and fringe payments, and identity of the Prevailing Wage Coordinator for the project. Supply all subcontractors with any changes in the Prevailing Wage rates issued during the life of the project. Out-of-State contractors must submit to the Ohio Secretary of State, the full name and address of their Statutory Agent in Ohio. Submit certified payrolls starting no later two (2) weeks after the initial pay period. Insure all payrolls include the following: A. Employees full name, address, and social security number B. Work classification (1) Be specific when listing laborers and operators (2) Show level/year for all apprentices C. Hours worked on the project (1) As of May 1, 1984, overtime is to be paid at not less than time and one-half for all hours worked in excess of forty (40) hours per week. D. Hourly rate of pay Actual hourly rate paid employee for the time worked. Overtime hourly rate of not less than time and one-half the basic or regular rate paid is required under Chapter 4115. In addition to paying not less than the predetermined rate for the classification is which the employee works, the amounts predetermined as fringe benefits in the wage determination issued for the project, shall also be paid. (Sample calculation: $12.82 (base rate) x 1 1/2 = $19.25 + $1.70 (fringe payments) = $20.93). Fringe payments must be entered in appropriate blocks on payroll forms when such fringes are paid to approved plans, funds, etc. E. List all fringe benefits (if any) and amount per hour for each (1) Hourly amount is to be based on 2080 hours per year. F. Total deductions G. Net pay for the pay period Send a copy of Apprenticeship Agreement for each apprentice and a Final Affidavit to: Findlay Prevailing Wage Coordinator Room 304 Municipal Building Findlay, OH 45840 (419) 424-7121

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects