Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 15, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Jamestown, RI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

RITBA is a quasi-public agency created by the Rhode Island General Assembly in 1954 as a corporate and body politic, with powers to construct, acquire, maintain, and operate bridge projects as defined by law. The Authority was responsible for the construction of the Claiborne Pell Bridge (formerly the Newport Bridge) which opened to traffic on June 28, 1969. The Authority has been responsible for the operation and maintenance of the Mount Hope Bridge between Bristol, Rhode Island and Portsmouth, Rhode Island and the Claiborne Pell Bridge between Newport, Rhode Island and Jamestown, Rhode Island since 1964 and 1969, respectively. On April 25, 2013, the State transferred custody, control and supervision of the land and improvements for the Jamestown Verrazzano and the Sakonnet River Bridges from the Rhode Island Department of Transportation (RIDOT) to the Authority. Ownership and title of the bridges remains with the State. In addition to the four (4) bridges noted above, the Authority also operates and maintains Route 138 through Jamestown and ten (10) smaller bridges associated with this highway and the approaches to the four (4) major bridges. Currently only the Claiborne Pell Bridge is tolled with tolls being collected in both directions at a single plaza on the Jamestown side of the bridge. Questions concerning this RFQ should be directed, via email to procurement@ritba.org no later than 2:00pm EDT October 27, 2023. RITBA will respond to all relevant questions no later than end of day EDT November 1, 2023. RITBA reserves the right to waive any irregularities and technical defects. RITBA reserves the right to modify, amend or waive any provision of this RFQ, prior to the issuance of an award for these services.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.