Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

No Information to Display

3607 Damon Rd

Demolition, Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

3607 Damon Rd, Apopka, FL

Subscribe to View Full Documents

Old Clarcona Elementary School Demolition Project The demolition project referenced above consists of demolition and removal from the site of all buildings, site structures, curbing and paving (including base), site waste treatment plant, and capping of all utilities below grade. Backfill and compaction of all excavations, grading of the site for positive drainage and sodding of all disturbed areas are required. Repair/replacement of select sections of the perimeter fence and adding a double gate for Grounds/Maintenance Access. The contractor will be required to perform an as-built survey after the site is cleared. The project will be demolished in two phases: Phase 1 must include the demolition of the canopy system and decking system around the portables. These are District Owned Portables which will be offered up for sale and this area must be cleared for the portables to be removed. Phase 2 will include the remainder of the campus-wide demolition including the waste treatment facility on site. NESHAP surveys to be provided, asbestos abatement (if required) by OCPS. o Please include seeding as an alternate to the sodding base scope. o Trees on site should be protected during demolition activities. o WW treatment and lift stations should be decommissioned/removed, piping would remain. o Site grading will be limited to disturbed areas, with no backfill of existing retention. o All OCPS salvage activities will be completed ahead of construction NTP. Question End Date 10/25/2023 2:00 PM OCPS has established the following goals for participation: Minority or Women-Owned Business Enterprises (MWBE) - 12% Local Developing Businesses (LDB) - 10% Veteran Business Enterprises (VBE) - 3%

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.