Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 18, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$1,100,000.00

Public - City

img_map_placeholder

Multiple Locations, Lenoir, NC

Our team is requesting plans for this project.

Subscribe to View Full Documents

The City of Lenoir (City) is requesting Statements of Qualifications from engineering firms to evaluate their professional civil engineering qualifications in accomplishing the subject project in accordance with this Request for Qualifications (RFQ). The City has been approved to receive funding through Session Law 2023-134, House Bill 259, Section 12.2.(e) to construct a water interconnection between the City of Lenoir and the Town of Valdese. The selected firm is expected to coordinate with the City of Lenoir staff and the Town of Valdese's design team in providing design services. The City reserves the right to waive any and all informalities in the selection process and also reserves to the right not to award the project. The City reserves the right to accept a firm that is most advantageous to the City. Selection will be made based on evaluation factors of past performance and experience with municipal public utilities systems, experience with similar projects, and professional personnel. Each Statement of Qualifications shall follow the topic outline shown in Sections 2.1 to 2.4. The overall submittal is limited to fifteen (15) 8.5 x 11 written pages, including the cover letter, with a font size no smaller than 11 pt. Failure to comply with these requirements will result in disqualification of the submittal. The selected consultant will be responsible for the preliminary and design phase which includes the planning, coordination, design, permitting (as required), providing an opinion of probable construction cost, bidding and award phase services. The selected consultant will also be responsible for providing construction administration and construction observation services during the construction phase of the project. Dr. Jeff Church, Public Utilities Operations Manager, is the City's contact for further information. Please note that any request for information or contact with elected officials of the City of Lenoir regarding this Request for Qualifications will result in disqualification. Any request for clarification of the Request for Qualifications shall be directed by email only to jeff.church@ci.lenoir.nc.us.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.