Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
May 13, 2024
July 23, 2024
2261 Keating Cross Rd
Renovation
No Information to Display
$365,000.00
Public - State/Provincial
2261 Keating Cross Rd, Saanichton, BC
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Adjacent to the existing server room, BCEHS is planning to construct a new server room for the NG911 equipment. The room will require a new UPS unit with N+1 redundancy to enhance system reliability, a new cooling system, and all required electrical connections to the new UPS system, generator, and equipment, as well as security and finishes. The proponent must verify connectivity paths between entrance closets and server rooms, confirm space requirements for equipment and rack installation and determine if network paths permit running network connections directly to NG911 equipment to improve reliability. TIMELINE: Request for Proposal to provide professional Architectural Consulting and professional Engineering services as required with respect to the design and construction of the Project is underway. The anticipated scope for planning Pre-Design, Schematic Design and Design Development is as follows: Confirm scope of work and schedule during the first meeting with the Client Team, including all milestone dates, interim meeting dates and Consultant coordination dates. Attend meetings with User/Stakeholders as required to confirm program needs. Facilitate regular coordination meetings with the Client and Consultant Team. Record and distribute meeting minutes to the Team and EHS Project Manager within three (3) days. Lead Stakeholder and Client review meetings for Schematic Design and Design Development. Prepare Schematic Design (SD) and Design Development (DD) Drawings. Work with the Owner's Cost Consultant to confirm the budget at key milestones, as required. Provide Value Engineering services due to scope changes and budget considerations as required. Tender & Award target completion date: May 3, 2024. Further update in late 2023,pending selection of a preferred proponent.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Saanichton, BC
--
Kelowna, BC
--
100 Mile House, BC
Bid Date: Nov 07 2023
Fernie, BC
Bid Date: Nov 13 2023
Lillooet, BC
Bid Date: Nov 07 2023
Vancouver, BC
--
Vancouver, BC
--
Fort St. John, BC
Bid Date: Nov 08 2023
Vancouver, BC
--
Coquitlam, BC
Bid Date: Mar 27 2023
100 Mile House, BC
Bid Date: Oct 26 2023
Langley, BC
Bid Date: Nov 02 2023
Vancouver, BC
--
Kelowna, BC
--
Kelowna, BC
Bid Date: Nov 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
