Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

December 18, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, South San Francisco, CA

Subscribe to View Full Documents

HSIP - Curb Ramp Replacement Project. Question Submission Deadline November 3, 2023, 3:00pm The work consists of removals, paving, concrete sidewalk, curb ramps, curbs and gutters, and striping construction located at the Walnut Ave & Lux Ave, Walnut Ave & Park Way, Olive Ave and Pine Ave, Olive Ave and Aspen Ave, and Linden Ave & 8th Ln intersections in South San Francisco, CA. Liquidated Damages Hot mix asphalt around the raised utility shall be placed and compacted within twenty-four (24) hours of raising the utility. Specific liquidated damages for each utility adjustment delay shall be in the sum of one hundred dollars ($100) per calendar day. The Contractor shall be assessed for the working days for non-compliance, and the liquidated damages specified or at the City's option, hire outside Contractors to perform the work. Description The Contractor Shall Furnish All Labor, Materials and Equipment Necessary for Public Notification and Street Posting and Distribution of Notices for the Following Scopes of Work For the Duration of the Construction Period. Cashier's check or certified check, payable to the order of the City of South San Francisco, of not less ten percent (10%) of the bid or a bond in said amount, payable to the City of South San Francisco and signed by the bidder as well as a corporate surety, shall accompany the bid. Failure by the Contractor to follow the striping and pavement marking schedule per the approved schedule, scope of work specified, and all incidental work as required by this bid item shall be deemed as non-compliance to the contract provisions and shall be final. Aggregate base exceeding a workable moisture content will be rejected by the Engineer and shall be immediately removed from the project site by the Contractor

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects