Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

December 18, 2023

January 27, 2024

7509 N Beach Dr

Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

7509 N Beach Dr, Fox Point, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Site Directions: 7509 N Beach Drive, Fox Point, WI The project contemplated herein consists of the Contractor exposing, disconnecting, and abandoning the existing waterline. The Contractor shall then directional bore approximately 700 of new HDPE pipe from the pump station to the watermain on Beach Drive. All contractor and subcontractor employees shall obtain specific site plant safety training from Veolia Water prior to working on the site. Veolia Water will offer a total of two one-hour training sessions to the contractor and any subcontractors. The Contractor shall adhere to all Veolia Water safety policy and procedures. All interested bidders should direct their questions about the pre-bid meeting to barbara.brown2@veolia.com or call 414-747-3852. Veolia Water further reserves its rights to postpone the award of the Contract for a period of time not exceeding forty-five (45) days from the bid opening date. Bids shall remain firm and may not be withdrawn during this forty-five (45) day period. Veolia Water reserves the right to reject all Bids or any Bid or Bids not conforming to the intent and purpose of the Contract Documents and to waive any informalities or deficiencies in any Bid to the extent that informality or deficiency is immaterial and promptly cured. The time for completion of the Contract shall be forty (40) days from the date of Notice to Proceed. Veolia Water/MMSD participation goals for SWMBE are: Minority-owned Business - 13% Small Business/Veteran-owned Business - 5% Women-owned Business - 2%

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.