Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

January 1, 2024

January 1, 2025

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Frisco, CO

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Any questions regarding this Request for Proposal should be directed to Wayne Byrne, 970-668-4230 or wayne.byrne@summitcountyco.gov. All interested firms are invited to submit a proposal in accordance with the terms and conditions stated in this Request for Proposal. 1. Contractor to provide all comprehensive inspection requirements required to conform to the AHJ, NWCOG. 2. Reporting to AHJ will be the contractor's responsibility. The contractor shall make all necessary reports to the AHJ and carbon copy Owner's Rep., for records compliance. Fines received from contractors' failure to report will be the responsibility of the contractor 3. Services will be Bi-annually with an annual safety check included in one visit. 4. All components listed below shall be covered under normal wear and tear for repair or replacement. The selected contractor shall have a parts inventory to support field operations of Owners elevators for timely repairs. 5. All parts used in operational repairs shall be new or approved by the owner. A records document of all maintenance shall be left on site showing all repairs, replacements and tests performed on units. 6. All required 5-year testing will be coordinated by the contractor. Contractor shall furnish all labor, transportation, and incidentals necessary to perform the elevartor and lift maintenance service. Work shall be completed as set forth in a contract for this project to be negotiated with the county \ based upon the contractor's written proposal. This RFP contains the instructions governing the proposals to be submitted and the materials to be included therein. These are mandatory requirements that must be met to be eligible for consideration. Prospective applicants are welcome to make inquiries and ask questions concerning the RFP to obtain clarification of the any requirements or schedule a site visit to the properties. Direct all inquiries to: Wayne Byrne Facilities Maintenance Department Director 970-668-4230 wayne.byrne@summitcountyco.gov. Provide an outline of the contractor's understanding of the project. Summarize the basic approach to providing the services, and any recommendations on improving efficiencies in the process.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.