Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

May 27, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,250,000.00

Public - County

img_map_placeholder

Multiple Locations, Chelsea, AL

Subscribe to View Full Documents

Bids from General Contractor snot attending the Pre-Bid Conference will be rejected. Please contact Gina LeCroy at rlecrov@shelbval.com with any questions regarding this project. WIDENING ON SR-70 AND NEW ACCESS ROAD FOR SHELBY COUNTY LANDFILL FROM SR-70 TO LANDFILL ROAD TO INCLUDE GRADE, DRAIN, BASE AND PAVE F. Pavement repair and/or replacement: Whenever pipe trenches are cut across or along existing roadway, pavement or shoulders, backfill same and restore traffic over the cuts as quickly as possible. Add material and otherwise maintain such surface until the permanent pavement is restored (by the Contractor) or until the entire project is accepted. G. Approved chemicals: All chemicals used during project construction or furnished for project operation, whether herbicide, pesticide, disinfectant, polymer, reactant, fertilizer or of other classification, must show approval of either EPA or USDA. The use of all such chemicals and the disposal of residues shall be in strict conformance with instructions. H. Catalog data for OWNERs: Provide duplicate complete, bound sets of a compilation of catalog data of each manufactured item of mechanical and electrical equipment used in the work, and present this compilation to the ENGINEER for transmittal to the OWNER before payment of more than ninety percent (90%) is made. Include descriptive data and printed installation, operating, and maintenance instructions (including a parts list for each item of equipment). Provide a complete double index as follows: a. Listing the products alphabetically by name. b. Listing alphabetically the names of manufacturers whose products have been incorporated in the work, together with their addresses and the names and addresses of the local sales representative. I. Drawings of Record: the OWNER prior to approval of pay requests will review the record drawings. Up-to-date record drawings are a precedent to monthly payments to the CONTRACTOR. The CONTRACTOR shall provide and keep up-to-date a complete record set of blue line prints, which shall be corrected daily to show every change, and the approved shop drawings. Keep this set of prints at the job site and use only as a record set. This shall not be construed as authorization for the CONTRACTOR to make changes in the approved layout without definite instructions in each case. Submit the set to the ENGINEER upon completion of the project. J. Preservation of Existing Vegetation: Take reasonable care during construction to avoid damage to vegetation. Where the area to be excavated is occupied by trees, brush, or other uncultivated vegetable growth, clear such growth from the area, and dispose of it in a satisfactory manner. Leave undisturbed any trees, cultivated shrubs, flowers, etc., situated within public rights-of-way and/or easements through private property but not located directly within excavation limits.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.