Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

No Information to Display

533 N Roy Ave

Demolition, Renovation, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

533 N Roy Ave, Melrose Park, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Classroom Renovation at the Following School: Roy School 533 N. Roy Ave. Northlake, Il 60164 All Bidders: Mannheim School District 83 Will Receive Separate Sealed Bids for Each of The Following Bid Packages: - Bid Package 2c - Demolition - Bid Package 6a - General Trades - Bid Package 9a - Flooring - Bid Package 9c - Painting - Bid Package 15b - Plumbing - Bid Package 15c - Hvac - Bid Package 16a - Electrical Qualified Bids Must Include a Bid Security in the Amount Often Percent (10%) of the Base Bid, Which Shall Be in the Form Of a Bid Bond or Certified Check. Statements Must Be Received in the Office of the Architect No Later Than Monday, October 30th, 2023. Please Email Completed Aia 305 Forms to Spm Architects, Inc. Office At Arivera@spmarchitects.com. All Interested Bidders Must Demonstrate Previous Experience With Repair & Site Work in State of Illinois Schools in a Confidential Aia 305 Statement of Qualifications. A Complete Bid Will Include the Bid Form, Bid Bond, and Signed Non-collusion Statement. The School District Reserves the Right to Set Aside a Bid From a Contractor Who in the School District's Opinion Does Not Exhibit Experience Equal to the Size and Scope of This Project. The Board of Education Reserves the Right to Accept or Reject Any or All Bids. Bidder May Not Withdraw His Bid for a Period of Sixty (60) Days After The Date Set for the Opening Thereof.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects