Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

May 13, 2024

November 29, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$900,000.00

Public - City

img_map_placeholder

Multiple Locations, Clive, IA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This project includes all materials, equipment, transportation and labor necessary for the reconstruction of NW 114th Street between Walnut Creek Bridge to NW 111th Street. Project items include approximately 5,400 SY of 8 thick PCC pavement, 800 LF of 12 water main, 250 LF of 6 sanitary sewer service, 400 LF of 15 storm sewer, sidewalk, driveways, traffic control, restoration, and associated work. Specific project location along with the kind and approximate quantity of materials to be used shall be as set forth in the Plans and Specifications. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Iowa Code and as outlined in the Instruction to Bidders in an amount equal to Ten (10) percent of the total bid amount. Work on the improvements shall commence on or before the late start date of May 13, 2024 and shall be substantially complete on or before November 1, 2024. Liquidated damages for noncompliance with said substantial completion provisions will be assessed at the rate of Seven Hundred Fifty Dollars ($750.00) for each calendar day thereafter that the work remains incomplete. Remaining punch list items, restoration, and sodding shall be fully completed on or before November 29, 2024. Liquidated damages for noncompliance with said completion provisions will be assessed at the rate of Seven Hundred Fifty Dollars ($750.00) for each calendar day thereafter that the work remains incomplete. The City of Clive reserves the right to reject any and all bids.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.