Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

January 22, 2024

S Nearglen Ave & W Gladstone St

Paving, Site Work

No Information to Display

$216,230.00

Public - City

img_map_placeholder

S Nearglen Ave & W Gladstone St, Glendora, CA

Subscribe to View Full Documents

Construction of crosswalk enhancements near Washington Elementary School at the intersection of W. Gladstone Street and S. Nearglen Avenue. The work consists of installation of signing and striping including enhanced crosswalk markings, signage, in-roadway pavement flashers, rectangular rapid flashing beacons (solar powered), construction of median refuge island, curb extensions, sidewalk, pavement reconstruction along with demolition and traffic controls. The goal is to complete construction before school goes back in session after winter break in January 2024. For questions regarding the bid documents or for project information, please contact Transportation Manager, Steven Mateer at (626) 852-4846 or smateer@cityofglendora.org. Engineers estimate without options $186,896.97 with options $216,229.53 he City of Glendora is soliciting bids for the construction of crosswalk enhancements near Washington Elementary School at the intersection of W. Gladstone Street and S. Nearglen Avenue. The work consists of installation of signing and striping including enhanced crosswalk markings, signage, in-roadway pavement flashers, rectangular rapid flashing beacons (solar powered), construction of median refuge island, curb extensions, sidewalk, pavement reconstruction along with demolition and traffic controls. This is a high priority project for the City. The goal is to complete construction before school goes back in session after winter break in January 2024. Project plans and specifications are included in Attachment A and B. III. In addition to the requirements of Section 6.2, during performance of the work, Contractor shall facilitate a bi-weekly meeting (every 2 weeks) to deliver and discuss the following items: A. Existing conditions report and status of overall work schedule B. Progress reports of work completed. C. Report of work to be completed. D. Report on pending request for information (RFIs). IV. All work is subject to review and acceptance by the City, and must be revised by the Contractor without additional charge to the City until found satisfactory and accepted by City. V. Contractor shall provide safe and continuous passage for pedestrian and vehicular traffic in accordance with the Work Area Traffic Control Handbook (WATCH), latest edition.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.