Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

January 15, 2024

June 30, 2025

Douglas Hwy

Paving, Site Work

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

Douglas Hwy, Juneau, AK

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Contract#: SFHWY00058-3 Federal# / IRIS Program#: 0958032 / SFHWY00058-3 Region: Southcoast Region Engineer's Estimate Range: Between $5,000,000 and $10,000,000 Work required for this project includes reconstructing and resurfacing Douglas Highway from Egan Drive to about 700 feet south of Cordova Street. Other work includes ADA improvements, storm drain system repairs, and signing and striping improvements. A list of anticipated work items are: pavement removal and roadway excavation, pavement cold planning, removal and installation of concrete gutter and curb & gutters, removal and installation of asphalt and concrete sidewalks, reconstruction of existing accessible sidewalk ramps, replacement and lining of existing culverts and storm drains, construction of riprap aprons, installation of new curb inlets, removal and installation of storm drain manholes, replacement of existing signs, addition of new signs, new pavement markings, and replacement of existing guardrail and bridge transition rail. The apparent successful bidder must furnish a payment bond in the amount of 100% of the contract and a performance bond in the amount of 100% of the contract as security conditioned for the full, complete and faithful performance of the contract A bidder requesting assistance in viewing the project site must make arrangements at least 48 hours in advance. The point of contract for inquiries for this project is Keri Williamson, P.E Email: Keri.williamson@alaska.gov Phone: (907) 465-1819 A bidder may direct questions concerning bidding procedures and requirements to: Email: srdotpfcontracts@alaska.gov Phone: (907) 465-4493 AK DOT - JNU Douglas Hwy Resurface and Sidewalk Repairs Stage III *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.