Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

February 6, 2024

303 E Lipoa St

Renovation

No Information to Display

$500,000.00

Public - County

img_map_placeholder

303 E Lipoa St, Kihei, HI

Subscribe to View Full Documents

Bidders shall be licensed in accordance with Chapter 444, HRS, relating to the licensing of contractors. The Contractor and his Subcontractor(s), if any shall comply with all applicable revisions of the prevailing wage rate schedule as required under Chapter 104, H.R.S Work Covered by Contract Documents A. The work of this Contract comprises the Kihei Community Center: HVAC Improvements project, P23-001, at TMK: (2) 2-2-024-023, Kihei, Maui, Hawaii, to include but not limited to the 1:1 replacement of 2 sets of Air Handler Units (AHU) and Air Cooled Condensing Units (ACCU). B. The Contractor is required to furnish all labor, materials, equipment, services, and transportation necessary and incidental to construction operations for the Work in accordance with the Contract Documents. The Contractor is required to provide work not indicated on the drawings or expressly required by the specifications, but which is manifestly necessary for proper, full, and faithful performance of the work in accordance with the intent and meaning of the Contract Documents. BUILDING FLOOR AREA: 16,100 SF Any questions pertaining to the process, or help in submitting a bid, can be directed to Christy Kailiehu at (808) 270-749 Mobilization is hereby defined as the preparatory work and operations, including, but not limited to the necessary movement of personnel, equipment, and incidentals to the project site; establishment of all offices, buildings, and other facilities necessary for work on the project; and work and operations which must be performed, and costs incurred before starting work on the various contract items on the project site. B. Bonds and Insurance will include all upfront costs associated with the issuance of payment and performance bonds for completion of the work and the costs for providing Insurance meeting the requirements set forth in these documents.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects