Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

February 1, 2024

No Information to Display

1005 State University Dr

Demolition, Renovation

No Information to Display

$4,150,000.00

Public - State/Provincial

img_map_placeholder

1005 State University Dr, Fort Valley, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Student Residential Facility Question Deadline 10/27/2023 at 2:00 PM ET Questions about any aspect of the RFQ, or the project, shall be submitted in writing (e-mail is preferable) to: Mr. Edwidge Dufresne Director of Facilities Management Fort Valley State University 1005 State University Drive Fort Valley, Georgia 31030 email: edwidge.dufresne@fvsu.edu The Guaranteed Maximum Price is estimated at $4,455,000 The preliminary stated cost limitation (SCL) or construction cost of the Project is estimated at $4,150,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. FVSU proposes to construct a 32-bed (4-bedroom, 4 bath units with full kitchen) residential facility totaling approximately 13,250 square feet that would house students enrolled in nursing and associated health science programs. The building is anticipated to be 2 story, wood-framed apartment style structure to be located across the street from campus on the current site of the Gano Building. Demolition of existing Gano Building is included in this project. The project is subject to Davis-Bacon Act requirements BOR reserves the right to reject any or all statements of qualifications or proposals, and to waive technicalities and informalities at their discretion. The Guaranteed Maximum Price is estimated at $4,455,000 The preliminary stated cost limitation (SCL) or construction cost of the Project is estimated at $4,150,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. The Design Builders (DB) services are anticipated to commence by February 2024 with construction documents anticipated for completion in Fall 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects