Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 6, 2023

December 18, 2023

Mountain Hwy 99

Paving, Site Work

No Information to Display

$1,636,017.00

Public - County

img_map_placeholder

Mountain Hwy 99, Kernville, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The scope of work includes all aspects of road repairs to reestablish access to traffic. Construction services are anticipated to include, but are not limited to, debris removal, earthwork, lane/shoulder repairs, paving, and installation/maintenance of road/embankment stabilization and roadside drainage features. See the attached vicinity map, and list of anticipated items of work with estimated quantities, as a tool for preparing your Lump Sum bid proposal. Note that the work items provided in the attached items of work list along with estimated quantities serve as an estimate for estimating purposes only and do not constitute exact quantities. By providing a lump sum bid proposal for this work, it is assumed that the Contractor has reviewed the project site and fully understands the scope of the work to be performed. Contractor shall coordinate with Utility Owners for their re-installation/repair of any aboveground or underground utilities if they apply. Due to the nature of the work included in this request for emergency construction services, a performance bond, and a payment bond will be required. 1. Working up Mountain Road 99 (M99) from mile post 1 to mile post 20.5 to complete all work per the Project Item List and Estimated Quantities, and/or as directed by the Engineer. 2. Proceed with work as necessary to accommodate construction traffic and equipment, as well as vehicular traffic. The Project has an estimated project cost of approximately $1,700,000. The contract will be awarded to the responsible bidder submitting the lowest-priced responsive bid. The Project is to be completed within thirty (30) working days. The work shall commence upon issuance of the Notice to Proceed by the County's Contract Administrator. Any questions, please contact me by phone: (559) 624-7147 or email: GLopez@tularecounty.ca.gov. Deadline for Emailed Questions October 17, 2023, by 12:00 pm No DBE goal is required.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.