Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

November 21, 2024

March 21, 2025

To Be Determined

Site Work

No Information to Display

$310,000.00

Public - City

img_map_placeholder

To Be Determined, Wilmington, NC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Scope of work includes cleaning of Raw Water Mains sized, 8”, 16", 20”, and 24", utilizing both conventional and ice pigging techniques. Additionally, the installation of pigging entry and exit points will be required. A deposit is required with the submission of the bid. When a deposit is required, the bidder must submit with the bid cash or a certified check, drawn on a bank or trust company authorized to do business in the State of North Carolina, payable to Cape Fear Public Utility Authority, in an amount at least equal to five percent (5%) of the total amount of the bid, as a guarantee that a contract will be entered into and that satisfactory performance and payment bonds will be executed. In lieu of making the cash deposit above described, a satisfactory bid bond in the amount of five percent (5%) of the total bid, executed by a corporate surety licensed under the laws of the State of North Carolina to execute such bonds, shall be submitted with each bid, conditioned that the surety will upon demand forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract in accordance with the bid bond *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Opinion of Probable Construction Cost: $290,000. - $310,000 A public bid opening will not be held. This is a single prime contract. The Work shall achieve Substantial Completion within 90 consecutive calendar days of the Notice to Proceed, and Final Completion of all Work within 120 consecutive calendar days of the Notice to Proceed. Time is of the essence Details and requirements for payment bonds and insurance are stated in the General and Supplementary Conditions. Inquiries concerning the bid shall be directed to the CFPUA Purchasing Division by email to bids@cfpua.org. Deadline for questions is Tuesday, October 15, 2024, at 2:00 PM. Cape Fear Public Utility Authority reserves the right to reject any and all bids. 1 The Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.