Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

December 21, 2023

Multiple Locations

New Construction, Site Work

No Information to Display

$117,941.00

Public - City

img_map_placeholder

Multiple Locations, Anacortes, WA

Subscribe to View Full Documents

This Project Includes Clearing and Grading the Site for Placement of Crushed Rock to Create a Building Pad, Extension of Utilities to the Building Pad as Required by Cxt for Cxt to Place a Prefabricated Concrete Restroom Building, and Final Connections to Utilities Stubbed to the Building Pad. The Extension of Utilities to Serve the New Building Restroom Will Include Water power and Sanitary Sewer. Once the New Building is Installed by Cxt, Construction is Anticipated to Include Installation of the Concrete Improvements Surrounding the Building ,installation of Stairs and Handrails, and Grading of Sloped Areas Within the Site Finished Grade With Native Soils. Site Infrastructure Needed to Serve a New Restroom Building is Expected to Include the Following: Regulatory Requirements to Include, but Not Limited to, Coordination of Site Inspections With Local Jurisdiction and Agencies, Review and Coordination of the Building Plan Information and Various Requirements Prepared by Cxt. Implementing Erosion and Sedimentation Controls. Coordination With the Appropriate Jurisdictions for Inspections of Utility Installation. Coordination With Owners Soils Testing Engineer for Inspections, Material Testing, Compaction Testing. A bid deposit equal to 5% of the bid amount is required. Engineer s estimate is $117,941.00.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.