Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

March 11, 2024

April 10, 2025

Multiple Locations

Site Work

No Information to Display

$1,800,000.00

Public - County

img_map_placeholder

Multiple Locations, Saint Augustine Beach, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Submittal Deadline for Qualifications has been extended to November 16, 2023 Question Deadline has been extended to October 31, 2023. The St. Johns County Utility Department (SJCUD) is looking to design and construct the Northwest Wells 8 and 9 (NW-8 & 9) located northwest of the existing NW Water Treatment Plant (WTP) and the Tillman Ridge Well 51 (TR-51) located north of the CR1`4 WTP. There is the potential of nine (9) other wells to be added later during the term of the Contract contingent upon availability of funds. The purpose of this RFQ is to solicit Qualifications from Respondents who are licensed to perform Design-Build services in the State of Florida, in accordance with Florida Statute 287.055, in order to provide Design-Build services for the design, permitting and construction of up to twelve (12) new public supply water wells for the utility service area, as well as the well header, electrical and instrumentation and control (I&C) equipment, generator and fuel tank, and associated concrete pads to convey raw water flow to the existing Northwest, CR214, Hastings, Inlet Beach, Northeast, and the future CR208 West Water Treatment Plants (WTP). The new wells will be constructed on sites currently owned by SJCUD as identified in the Design Criteria Package or on sites that will be purchased by SJCUD during this contract within the areas shown in the Design Criteria Package. The cost for each well will be based on the submission of a Lump Sum Cost Proposal by well location, per the project timeline provided herein, over a five (5) year period and two (2) one-year renewal options for a total of seven (7) years if required. St. Johns County reserves the right to accept or reject any or all bids/proposals, waive minor informalities, or award the bid/proposal which best serves the interests of St. Johns County. Question Deadline 10/19/2023 at 4:00 PM ET Any and all questions or inquiries related to this RFQ, shall be directed in writing to the Designated Point of Contact questions or inquiries may be directed to Bryan Matus, Senior Procurement Coordinator at bmatus@sjcfl.us.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects