Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

December 4, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Millersville, MD

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Procurement Officer: Anna Lansaw Baltimore City Community College 2901 Liberty Heights Avenue Baltimore, MD 21215 Phone: 410.209.2378 e-mail: alansaw@bccc.edu Site Visit Attendance RSVP due by: October 17, 2023 / 4:00 PM Local Time erm of Service: Three (3) Year Term Contract with Two (2) one-year renewal option MBE Subcontracting Goal: 0 % Small Business Reserve: Yes Federally Funded: No Baltimore City Community College ("BCCC" or the "College") is soliciting bids to all labor, materials, and supplies necessary to conduct preventative maintenance, inspections, and repairs for the College's chillers at various locations. Scope of Work (Sow) 6.1 Preventive Maintenance Schedule and Response Time: 6.1.1 the Preventive Maintenance Schedule Will Include One (1) Comprehensive Annual Inspection and Maintenance Visit and Three (3) Quarterly Periodic Inspection and Maintenance Visits. The Inspection and Maintenance Check Points Will Meet or Exceed Those Provided in Samples. The Dates of These Preventive Maintenance Visits Will Be Provided to Facilities Within Ten (10) Working Days of the Contract Award. This is to Allow Them to Be Placed on a Preventive Maintenance Schedule. These Visits and the Maintenance Associated With the Service Are Included in the Cost of Service. A. All Items Are Subject to Compliance With the Terms and Conditions And Minimum Specifications. 6.1.2 Contractor's Response Time Shall Be Within 2-hours From the Acknowledgement Of Call From the College. Contractor's Personnel Shall Be on Campus Within 2 Hours From Time of Acknowledgement Otherwise Liquidated Damages May Be Applied for Failure to Response Within the 2-hours Window. Liquidated Damages May Be Assessed for Every 15 Minutes if Contractor's Personnel Fails to Meet After the 2-hour Response Time. Liquidated Damage Amount Shall Be The Contractor's Labor Hour Fee Listed in the Price Sheet Deducted From the Invoice.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects