Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2026

July 31, 2027

Multiple Locations

Site Work

No Information to Display

$1,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Surrey, BC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Phase 3 of the Delta South Surrey Greenway, from Nordel Way to 72nd Ave (DSSG-3). This area is subject to frequent flooding from the Lower Cougar Creek, adjacent to the service road to maintain the South Surrey Interceptor. This service road also currently acts as a temporary trail and provides access to the Delta Nature Reserve. TIMELINE: Request for proposal for design engineering services for the project has closed. As of January 9, 2024, a preferred proponent has yet to be identified. The consultant is to provide conditions assessments, preliminary design and detailed design services. Further update in spring 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.