Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 4, 2024

October 15, 2024

Multiple Locations

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Whistler, BC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The RMOW requires a hydraulic and geomorphological engineering analysis of sediment accumulation, and the impacts of this accumulation on the ability of the Fitzsimmons Creek diking system to provide protection against the design flood event. TIMELINE: Requests for proposal for contract administration and hydraulic design services, has been issued by the owner. The successful proponent will use surface water profile modelling to recommend sites in the creek for gravel removal in 2024 to re-establish the minimum freeboard for flood protection whilst also providing contract administration services to facilitate the gravel removal works. Notice of Award December 10, 2023. Post-removal completion report October 15, 2024 The RMOW has an option to extend this contract for two one-year periods for 2025 and 2026. If the RMOW chooses, the contract for the future year will be negotiated in October of the previous year once the final report has been delivered.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.