Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

No Information to Display

200 Fleetwood Dr

Renovation

No Information to Display

$125,000.00

Public - City

img_map_placeholder

200 Fleetwood Dr, Waynesville, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Waynesville R-VI School District will be accepting sealed bids for the purchase and installation of a new above ground diesel fuel storage tank (AST), and/or removal of the existing underground tank (UST) at the Waynesville School District Transportation Building. Option 1: Close and remove existing underground fuel tank, equipment, and backfill location in preparation for concrete resurfacing. Pricing should include all necessary excavation and machinery cost and all closure documentation, sampling, analytical costs, and MoDNR reporting associated with tank closure and removal, as well as listing of potential additional costs for disposal of any tank wastes (fuel, water, tank bottoms). Option 2: Provide (1) new, primed and painted double-wall, steel 12,000 gallon capacity tank for above ground diesel fuel storage. Price should include all necessary parts and components, machinery, installation and freight costs, as well as any other cost required to provide a complete tank installation that may not be listed. Bidder must be able to furnish proof of approved AST Financial Responsibility Registration. Option 3: Combined bidding option for both removal of existing underground tank and procurement and installation of(1) new above ground diesel fuel storage tank and all requirements as listed under each option above Questions can be directed to Aaron Tronstad, Director ofTransportation, at (573) 842-2199 or via email at atronstad@waynesville.kl2.mo.us.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects