Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Independence, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Independence, Missouri requests the submission of proposals from qualified Vendors for Water Meters. As part of this RFP the City is seeking to replace their existing water meters ranging in size from 5/8" to 8". The meters in the size range of 5/8" to 4" are to be replaced with an electronic, solid state meter which is to be powered by an internal battery. The 6" and 8" meters will be replaced with a meter similar to what is existing per the installation. All meters shall meet or exceed the specifications herein. These meters are to be installed, by others, inside of a pit/vault/well or within a basement, crawl space, or other suitable location on the premises. The details of these installations are included in Attachment 4. The plumbing connections of the proposed meters must match the existing conditions found at these locations. The electronic meters provided must also be capable of communicating, connecting to, and compatible with the communication protocol of multiple Advanced Metering Infrastructure (AMI) providers and platforms including point-to-point (PTP), mesh or cellular networks. The compatibility of the proposed meters must be demonstrated through past projects utilizing the bidders proposed meters. Submit questions regarding this RFP Electronically Deadline for Questions is 5:00 PM on October 26, 2023. Evaluation November 1 - November 15, 2023 Recommendation to Council December 4, 2023

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects