Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

February 11, 2024

15203 S Golden Rd

Paving, Renovation, Site Work

No Information to Display

$140,000.00

Public - State/Provincial

img_map_placeholder

15203 S Golden Rd, Golden, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Colorado Department of Public Safety, Division of Colorado State Patrol, is seeking qualified Offerors for weatherizing Mule Barn, Bldg. #59, at Camp George West in Golden, Colorado. The state of Colorado, Department of Public Safety is requesting a Documented Quote from a single Offeror for installing a new drain line which will reroute to the northeast side of the facility. The Offeror shall be the prime for every part of this project and select sub-contractors as needed. The Offeror must verify all measurements to insure all materials are included within their proposal. The work within this project is to remove existing metal roofing, installing Oriental strand board (OSB), replacing corrugated metal roof, installing metal siding panels (match existing) on all building exterior walls, painting panels and restoring front /back of building to preserve historic appearance. All elements of pricing, including design, material production, and delivery of product must be based on the work being performed. Quote must include demo of existing concrete, cutting of asphalt and concrete, removal of all demoed unused materials, removal of any and all trash and a final cleanup once work is completed and approved. Completion of project must be completed within 90 days from the notice to proceed and due to the nature of this facility; all materials must be received and ready prior to scheduling installation dates. Concrete and or asphalt may be an exception to this. Metal panels and metal roofing must match existing panels and be approved be Colorado Department of Public Safety (CDPS) project management

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.