Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 18, 2023
November 17, 2023
No Information to Display
1285 Petit Jean Mountain Rd
Renovation
No Information to Display
$19,000.00
Public - State/Provincial
1285 Petit Jean Mountain Rd, Morrilton, AR
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Prospective Contractor shall purchase and install four (4) Buck Stoves, Model 74 in cabins 1, 6, 7 and 12. 1. Specifications for the Buck Stove 74 are: a. Stove Dimensions: 21-1/2" H x 27-5/8" W x 22-3/8" D b. Stove Weight: 460 lbs. c. Cubic Feet Firebox Volume: 2.15 d. Firewood Length: 22" (side to side), 16" (front to back) e. Freestanding Clearance to Combustibles: 16" (Corner)* - 23" (rear) - 24" (side) f. Pedestal to be included with each stove. g. Blower to be included with each stove. h. Flue Size: 6" i. Hearth Pad Size: 50" W x 54" D 34"W x 48"D j. Heat Capacity: 1500-2600 sq. ft. D. Prospective Contractor shall purchase and install two (2) Buck Stoves, Model 21 in cabins 8 and cabin 9. 1. Specifications for the Buck Stove 21 are: a. Stove Dimensions: 20-1/4" H x 22" W x 18-1/8" D b. Stove Weight: 317 lbs. c. Cubic Feet Firebox Volume: 1.6 d. Firewood Length: 11" front to back e. Pedestal to be included with each stove. f. Blower to be included with each stove. g. Flue Size: 6" h. Hearth Pad Size: 33" W x 40" D i. Heat Capacity: 800 - 1,800 square feet E. Prospective contractor shall provide the following for each cabin: 1. Cabin 1 a. Prospective contractor shall reline cabin 1 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 1 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 1 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 2. Cabin 6 a. Prospective contractor shall reline cabin 6 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 6 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. 3. Cabin 7 a. Prospective contractor shall reline cabin 7 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 7 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 7 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 4. Cabin 8 a. Prospective contractor shall reline cabin 8 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 21. d. Prospective contractor shall insulate cabin 8 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 8 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 5. Cabin 9 a. Prospective contractor shall reline cabin 9 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 21. d. Prospective contractor shall insulate cabin 9 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 9 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 6. Cabin 12 a. Prospective contractor shall reline cabin 12 with 9" round, stainless steel rigid liner pipe. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 1 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Morrilton, AR
Bid Date: Feb 07 2023
Morrilton, AR
Bid Date: Jan 25 2024
Morrilton, AR
Bid Date: Aug 08 2023
Springdale, AR
Bid Date: Oct 23 2023
Wilson Junction, AR
Bid Date: Nov 01 2023
Little Rock, AR
Bid Date: Oct 25 2023
Little Rock, AR
Bid Date: Oct 23 2023
Perryville, AR
Bid Date: Oct 23 2023
Little Rock, AR
Bid Date: Oct 05 2023
Pine Bluff, AR
Bid Date: Nov 01 2023
Searcy, AR
Bid Date: Nov 01 2023
Arkadelphia, AR
Bid Date: Nov 07 2023
Arkadelphia, AR
Bid Date: Nov 07 2023
Mountain View, AR
Bid Date: Oct 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
