Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

September 4, 2024

41st St

Paving, Site Work

No Information to Display

$2,065,959.00

Public - City

img_map_placeholder

41st St, Miami Beach, FL

7

26

2

4

Subscribe to View Full Documents

As of January 9,2024, project was awarded, March is anticipated start date. The scope of work for this project is outlined in the City's Water System Master Plan dated October 2019, project W-39. The work includes the complete replacement of the existing 16-inch cast-iron aerial water main crossing that is currently attached to the 41st Bridge between Indian Creek and Collins Avenue. The existing water main is approximately seventy (70) years old and was prioritized in the master plan due to the high probability and consequence of failure. In addition, hydraulic modeling performed by the City has determined that upsizing the system to a 20-inch diameter (I.D) (Ductile Iron Pipe) will provide the required flow capacity to support anticipated growth and increasing demands along Collins Avenue in the mid-beach area. The proposed water main route is approximately 1,280 linear feet (LF) in length, with 920 LF HDPE DR 11 Pipe (20-inch), 300 LF Ductile Iron Pipe (20-inch), and 60 LF Ductile Iron Pipe (16-inch). The work set forth within these contract documents include the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Question Deadline 10/30/2023 at 5:00 PM ET The anticipated award date for this project is December 13, 2023. A notice to proceed is anticipated to be issued in December of 2023

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.