Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 26, 2023

No Information to Display

To Be Determined

Asbestos Abatement, Demolition, Renovation, Site Work

No Information to Display

$20,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Davis, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The original North/South hospital wing was built in the 1920's and the structure has now been deemed structurally inadequate by CA AB 2190 and must be prepared for demolition. The North/South hospital wing will be completely vacated in 2023 and will then be decoupled from the East Tower. The project scope includes decoupling the N/S hospital wing from the East Tower (Increment 1), various renovations in the existing East Tower to support the East Tower operations through 2030 (Increment 2) and the interior hazardous material abatement and soft demolition of the N/S hospital wing (Increment 3). Phase 3 covers construction of the project. Phase 1 covers site investigation and documenting of existing conditions to assist in design associated with the work. Work in this bid package includes: 3.1 Selective Demolition and Abatement 3.2 General Trades 3.3 Electrical and Low Voltage 3.4 Mechanical and Plumbing 3.5 Fire Suppression 3.6 Personnel and Material Hoist All work included in this bid package will be performed under the authority of and jurisdiction of HCAI Level 01. The anticipated cost of the Phase 3 Construction work for the North/South Tower Demolition Project is $20M. Any requests for information (RFI) regarding the Bid must be received electronically before 10/17/2023 @ 5:00PM PDT.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.