Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

March 30, 2024

W 9th St

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

W 9th St, Chandler, OK

Subscribe to View Full Documents

Drainage, Culverts, Waterways, Stormwater Channels, Storm Drain and Paving, Erosion Control - Temporary, Concrete Pavement, Paving - Concrete, Pavement Removal, Stormwater Improvements, Removal and Replacement of pipe, Utility Street Construction and Excavation, Paving (Asphalt or Concrete)., Installation of approximately 205 LF of 18" CPP pipe and approximately 89 LF of 24" CPP pipe. Installation of approximately 5 curb inlets, 1 storm manhole, and 1 24" PCES. Removal and replacement of asphalt and concrete pavement. Site is located west of the intersection of W. 9th Street and S. Price Avenue.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects