Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

April 9, 2024

Multiple Locations

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Moss Point, MS

Subscribe to View Full Documents

The work for which proposals are invited consists of the furnishing and installing of new sewer lines and manholes to replace existing asbestos sewer piping. The location of this project is Bay Avenue in Moss Point, Mississippi. Bidder should direct questions to Doug Wimberly, P.E. of Neel-Schaffer, Inc. (doug.wimberly@neelschaffer.com) 707 Watts Avenue, Suite C, Pascagoula, MS 39567. Written questions may be submitted by mail to the address shown above, by e-mail or FAX. The question period will end at 5:00 pm, 7 calendar days prior to the bid opening date. Question Deadline 10/31/2023 The City of Moss Point reserves the right to accept or reject any bids.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects