Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

January 1, 2024

June 29, 2024

Solley Rd

Site Work

No Information to Display

$3,000,000.00

Public - County

img_map_placeholder

Solley Rd, Glen Burnie, MD

Subscribe to View Full Documents

This project consists of the following replacement of approximately 60 feet of 16" diameter PCCP sewage force main with new 16" PVC C900 pipe, replacement of approximately 350 feet of 18" PCCP force main with new 18" PVC C900 pipe, rehabilitation of approximately 2,865 feet of existing 18" PCCP sewage force main with structural classIV (AWWA M-28) cured-inplace (CIPP) lining between North Shore Road and Nabbs Creek Road, and temporary bypassing with line stopping. a. Direct all inquiries concerning this project in writing to Mr. Abdul B. Azimi via email at pwvazi22@aacounty.org. b. All inquiries must be received by c.o.b., Friday, October 20, 2023. Solley Road Emergency Force Main Replacement.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects