Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 8, 2024

October 23, 2026

400 W Washington Blvd

Demolition, LEED Certification, New Construction, Site Work

No Information to Display

$81,600,000.00

Public - County

img_map_placeholder

400 W Washington Blvd, Los Angeles, CA

Subscribe to View Full Documents

PN- 07T-731.01/107T-709.03, 2020-06405-000 Financial ID: 57T.4709.05.03; 57T.4731.02.01; 37T.5710.03.12; 37T.5710.03.14; 37T.5710.03.15 License Requirements B The scope of work for Sage Hall and Design and Media Arts(DMA) Projects include the demolition of a 3-Story Sage Hall and a connecting Bridge. Construction of a new LEED Certified 3-Story DMA building, 89,445 GS; Consisting of classroom, laboratory, faculty offices, exhibition, and supporting spaces including infrastructure work and new fire lane. The Scope of work for Theater Demolition, New Exterior North Wall - Magnolia Hall, and Hardscape/Landscape - North side of Magnolia Hall Projects will include demolishing the Grand Theater building in its entirety. The existing foundation is to be cut and removed down to 3-0 below grade. The existing foundation 3-0 below grade is to remain. The excavated area will be filled and a new fenced in plaza area with landscaping and ground cover will be added. The exposed north and east walls will be enclosed with a new exterior wall system consisting of exterior stucco finish and curtain wall system. The existing fire riser will remain and will be enclosed with new exterior walls and a roof. The south wall of the Grand Theater is separated from the remainder of the building by a 9 seismic separation joint. Careful demolition of the south exterior wall is necessary so as not to impact the existing adjacent building, which will remain protected-in-place. Shoring will be required to support the existing foundation systems. Online Q&A Yes Q&A Deadline 10/18/2023 2:00 PM (PDT) Contract 1 (includes Projects 1 and 2): Description of Project 1- Sage Hall Demolition (07T-709.03; 57T.4709.05.03): The scope of work includes the demolition of a 3-Story Sage Hall and a connecting Bridge. Estimated Range of Construction Cost: $3,600,000 Description of Project 2- Design and Media Arts (07T-731.01; 57T.4731.02.01): The scope of work includes construction of a new LEED Certified 3-Story Design Media Arts (DMA) building, 89,445 GS; Consisting of classroom, laboratory, faculty offices, exhibition, and supporting spaces including infrastructure work and new fire lane. Estimated Range of Construction Cost: $70,350,000 Contract Type (Contract 1) : Construction Services Agreement ("Lump Sum/Low Bid"). Contract 2 (includes Projects 3, 4, and 5): Description of Project 3- Theater Demolition (07T-710.12; 37T.5710.03.12): The Scope of Work will include demolishing the Grand Theater building in its entirety. The existing foundation is to be cut and removed down to 3'-0" below grade. The existing foundation 3'-0" below grade is to remain. Estimated Range of Construction Cost: $4,500,000 Description of Project 4- New Exterior North Wall - Magnolia Hall (07T-710.14; 37T.5710.03.14): The Scope of Work will include the south wall of the Grand Theater, which is separated from the remainder of the building by a 9" seismic separation joint. Work includes careful demolition of the south exterior wall is necessary so as not to impact the existing adjacent building, which will remain protected-in-place. Shoring will be required to support the existing foundation systems. Estimated Range of Construction Cost: $1,800,000 Description of Project 5- Hardscape/Landscape - North side of Magnolia Hall (07T710.15; 37T.5710.03.15): The Scope of Work will include filling the excavated area and constructing a new fenced in plaza area with added landscaping and ground cover. The exposed north and east walls will be enclosed with a new exterior wall system consisting of exterior stucco finish and curtain wall system. The existing fire riser will remain and will be enclosed with new exterior walls and a roof. Estimated Range of Construction Cost: $1,350,000 Contract Type (Contract 2): Construction Services Agreement ("Lump Sum/Low Bid"). Total Construction Duration to Substantial Completion (All Projects): Nine Hundred Sixty (960) Calendar Days. Substantial Completion to Final Completion (All Projects): Sixty (60) Calendar Days.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.