Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 8, 2023
January 8, 2024
October 23, 2026
400 W Washington Blvd
Demolition, LEED Certification, New Construction, Site Work
No Information to Display
$81,600,000.00
Public - County
400 W Washington Blvd, Los Angeles, CA
PN- 07T-731.01/107T-709.03, 2020-06405-000 Financial ID: 57T.4709.05.03; 57T.4731.02.01; 37T.5710.03.12; 37T.5710.03.14; 37T.5710.03.15 License Requirements B The scope of work for Sage Hall and Design and Media Arts(DMA) Projects include the demolition of a 3-Story Sage Hall and a connecting Bridge. Construction of a new LEED Certified 3-Story DMA building, 89,445 GS; Consisting of classroom, laboratory, faculty offices, exhibition, and supporting spaces including infrastructure work and new fire lane. The Scope of work for Theater Demolition, New Exterior North Wall - Magnolia Hall, and Hardscape/Landscape - North side of Magnolia Hall Projects will include demolishing the Grand Theater building in its entirety. The existing foundation is to be cut and removed down to 3-0 below grade. The existing foundation 3-0 below grade is to remain. The excavated area will be filled and a new fenced in plaza area with landscaping and ground cover will be added. The exposed north and east walls will be enclosed with a new exterior wall system consisting of exterior stucco finish and curtain wall system. The existing fire riser will remain and will be enclosed with new exterior walls and a roof. The south wall of the Grand Theater is separated from the remainder of the building by a 9 seismic separation joint. Careful demolition of the south exterior wall is necessary so as not to impact the existing adjacent building, which will remain protected-in-place. Shoring will be required to support the existing foundation systems. Online Q&A Yes Q&A Deadline 10/18/2023 2:00 PM (PDT) Contract 1 (includes Projects 1 and 2): Description of Project 1- Sage Hall Demolition (07T-709.03; 57T.4709.05.03): The scope of work includes the demolition of a 3-Story Sage Hall and a connecting Bridge. Estimated Range of Construction Cost: $3,600,000 Description of Project 2- Design and Media Arts (07T-731.01; 57T.4731.02.01): The scope of work includes construction of a new LEED Certified 3-Story Design Media Arts (DMA) building, 89,445 GS; Consisting of classroom, laboratory, faculty offices, exhibition, and supporting spaces including infrastructure work and new fire lane. Estimated Range of Construction Cost: $70,350,000 Contract Type (Contract 1) : Construction Services Agreement ("Lump Sum/Low Bid"). Contract 2 (includes Projects 3, 4, and 5): Description of Project 3- Theater Demolition (07T-710.12; 37T.5710.03.12): The Scope of Work will include demolishing the Grand Theater building in its entirety. The existing foundation is to be cut and removed down to 3'-0" below grade. The existing foundation 3'-0" below grade is to remain. Estimated Range of Construction Cost: $4,500,000 Description of Project 4- New Exterior North Wall - Magnolia Hall (07T-710.14; 37T.5710.03.14): The Scope of Work will include the south wall of the Grand Theater, which is separated from the remainder of the building by a 9" seismic separation joint. Work includes careful demolition of the south exterior wall is necessary so as not to impact the existing adjacent building, which will remain protected-in-place. Shoring will be required to support the existing foundation systems. Estimated Range of Construction Cost: $1,800,000 Description of Project 5- Hardscape/Landscape - North side of Magnolia Hall (07T710.15; 37T.5710.03.15): The Scope of Work will include filling the excavated area and constructing a new fenced in plaza area with added landscaping and ground cover. The exposed north and east walls will be enclosed with a new exterior wall system consisting of exterior stucco finish and curtain wall system. The existing fire riser will remain and will be enclosed with new exterior walls and a roof. Estimated Range of Construction Cost: $1,350,000 Contract Type (Contract 2): Construction Services Agreement ("Lump Sum/Low Bid"). Total Construction Duration to Substantial Completion (All Projects): Nine Hundred Sixty (960) Calendar Days. Substantial Completion to Final Completion (All Projects): Sixty (60) Calendar Days.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Los Angeles, CA
Bid Date: Oct 31 2023
Los Angeles, CA
Bid Date: Oct 19 2023
Los Angeles, CA
Bid Date: Jan 25 2024
Los Angeles, CA
Bid Date: Oct 19 2023
Los Angeles, CA
Bid Date: Oct 18 2023
Los Angeles, CA
Bid Date: Nov 07 2023
Los Angeles, CA
Bid Date: Nov 21 2023
Los Angeles, CA
Bid Date: Oct 25 2023
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
