Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 1, 2023

March 29, 2024

September 3, 2025

Multiple Locations

Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Armstrong, BC

Subscribe to View Full Documents

The Township of Spallumcheen (ToS) has formed a partnership with the Regional District of North Okanagan (RDNO) and The Okanagan Indian Band to deliver a regional wastewater recovery project. The Township of Spallumcheen will be the Owner for the purposes of this work. Through this Request for Proposal (RFP), the Township of Spallumcheen, here after referred to as the "Township" or the "Owner", invites Proposals for the construction of the wastewater collection system for Phase 1 of the North Okanagan Wastewater Recovery Project (NOWRP). Construction includes approximately 22.5 km of mainline installation (7.6 km force main and 14.9 km gravity), highway and rail crossings and connections to adjacent properties. This RFP applies to and governs the preparation of Proposals for the Contract listed above. The Contract is generally for the following work: A collection system area for the Township and RDNO Areas 'B' and 'C' that includes: 7400 m of Gravity and Force Main Piping - Open Trench Installation in a Roadway 400 m of Gravity and Force Main Piping - Open Trench Installation not in a Roadway 6100 m of Gravity and Force Main Piping - Directional Drilling Installation in a Roadway 3200 m of Gravity and Force Main Piping - Directional Drilling Installation not in a Roadway Manholes, air release valves, service connections and appurtenances 4 Lift Stations, 4 Highway Crossings, 3 Rail Crossings, and On site connections to the Swan Lake RV Resort Documents can be obtained from https://urbansystems.bidsandtenders.ca/

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.