Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

Multiple Locations

New Construction, Site Work

No Information to Display

$190,000.00

Public - City

img_map_placeholder

Multiple Locations, Issaquah, WA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Description of Proposal: The proposed project is the construction of a three-story apartment building consisting of eight residential units. Eight parking spaces are proposed at grade level behind ground floor space and under upper floors. Frontage improvements along the property street frontage consisting of curb, gutter, landscape strip and sidewalk will also be constructed as part of the project. Proponent: Houman Pournasseh, Manzel 1830 LLC Permit Number: SEP23-00001, ASDP23-00001 Location of Proposal: 830 2nd Avenue NW; King County Tax Parcel 8843900188 Lead Agency: City of Issaquah Project Planner: Doug Yormick, Associate Environmental Planner, P.O. Box 1307, Issaquah, WA 98027, 425-837-3083, dougy@issaquahwa.gov SEPA Review: The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Comment Period: This DNS is issued under WAC 197-11-340(2) and 197-11-680(3)(a)vii. There is a 14-day comment period for this determination, between October 5, 2023 to October 19, 2023. Anyone wishing to comment may submit written comments to the Project Planner at the email address or mailing address above. The Responsible Official may reconsider the determination based on timely comments. Appeal Period: Any person aggrieved by this determination may appeal by filing a Notice of Appeal no later than 4:00 p.m. on October 19, 2023 and paying the $1,653.75 filing fee. Appeals may be filed electronically by emailing the same to CPDSupportServices@ issaquahwa.gov A hard copy of the Notice of Appeal and a check for the filing fee must be deposited in the mail addressed to City of Issaquah Permit Center, Attention Candy Baer, PO Box 1307, Issaquah, WA 98027 and post-marked no later than October 19, 2023, for the appeal to be valid.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.