Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

December 26, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$2,184,194.00

Public - City

img_map_placeholder

To Be Determined, Hibbing, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Selecting qualified Contractors to bid the South Water Treatment Plant bid packages. Firms interested in providing Trade Contracting services for the project must submit their Request for Qualifications (RFQ) according to the requirements set forth in the RFQ utilizing the format and content guidelines stated in the RFP. Proposals will be reviewed, evaluated, and ranked using a qualification based selection process by the selection committee ONLY PREAPPROVED SUBCONTRACTORS WILL BE NOTIFIED AND INVITED TO SUBMIT BIDS. HPU nor the CMAR intends to award a contract on the basis of this solicitation, or to otherwise pay for information solicited herein. Pre-Qualification: Yes The project consists of upgrades relating to the South Water Treatment Plant while maintaining plant operations and treatment. Work includes construction of a new reclaim tank, chemical systems blowers, valve and flowmeter replacement, well house repairs, a new well, general building work, and associated electrical and controls. Rice Lake Construction Group has been selected as the Construction Manager At Risk (CMAR) for the South Water Treatment Plant. Rice Lake Construction Group is committed to a policy of equal employment opportunity and does not discriminate in the terms, conditions, or privileges of employment on account of race, age, color, sex, national origin, physical or mental disability, or religion or otherwise as may be prohibited by federal and state law. The Equal Opportunity Clause shall be considered to be part of every contract and subcontract. Various valve and flow meter replacements - New air scour blower package - New cast-in-place concrete backwash reclaim tank with process pumps - New chemical feed systems and revised chemical feed room layouts - New reservoir bypass line - New well and well house at existing well 11 site - Various building repairs at well 8 wellhouse - New electrical and control systems - New lighting throughout the water treatment plant - New generator at the water treatment plant site - New generators at Wells 2, 3 and 11 - Updated painting throughout the water treatment plant - New doors and windows - Updated restrooms at the water treatment plant - New roof at the water treatment plant - Ceiling replacement in portions of the water treatment plant - Coating of process piping at wellhouses Question Deadline 10/13/2023 Please contact Matt Perpich for all project related questions. Phone Number: 218-546-1915 Email: matt_perpich@ricelake.org

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.