Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

November 16, 2023

June 30, 2024

1245 NE 3rd St

Renovation

No Information to Display

$238,374.00

Public - City

img_map_placeholder

1245 NE 3rd St, Corvallis, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The following specifications are the minimum requirements for the Design-Build Installation of a Roof-Mounted Solar Array on Building 7 project. 1.1. Contractors shall use recyclable products to the maximum extent economically feasible in the performance of the contract work set forth in this document. 1.2. Includes final construction of a turn-key installation photovoltaic (PV) system, integration of power to the grid, and corresponding on-line monitoring equipment. See Attachment B for aerial view. 1.3. Includes necessary engineering to determine if roof weight capacity will allow solar installation. Contractor shall take every effort to maintain roofing integrity and warranty. 1.4. Includes final As-Built drawings, in both printed and digital formats, upon completion of installation. The work consists of the design and construction of a roof-mounted solar array at the Corvallis Transit Maintenance Facility (Building 7). The Engineering estimate is $238,374. Scott Dybvad, Sustainability Coordinator, (541) 766-6331, scott.dybvad@corvallisoregon.gov, will accept written questions seeking clarification about the proposal requirements, and will accept any exceptions to specifications or contract requirements, until 4:00 p.m. on Tuesday, October 24, 2023. All questions, including clarification of or exception to specifications, questions regarding proposal submittal instructions, questions or exceptions regarding contract terms, and questions or exceptions to the basis of award must be received by this date and time. No questions about the request for proposal document or the proposal process will be accepted after this date and time.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.