Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

January 9, 2024

October 5, 2024

47123 Buse Rd

Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

47123 Buse Rd, Patuxent River, MD

Subscribe to View Full Documents

**This solicitation is targeted specifically to the participating vendors in the NAVFAC Washington $750M 8(A) MULTIPLE CONSTRUCTION CONTRACT.** The Building 162 project is replacing the steel plate roof deck system and adding a drainage system around the roof to mitigate chronic water leakage into B162 through the roof and foundation walls. The project also includes building rehabilitation of structural concrete and the and installation of temporary bracing and shoring during concrete repair work. Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages - Construction, Liquidated Damages will be assessed in the amount of $773.00 for each calendar day of delay until the work is completed or accepted. Requirements: In accordance with FAR 28.101-4 and FAR 52.228-15 and Payment - Construction, and Payment Bonds, Bonds (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. are required from the awardee and shall be submitted for approval to the Contracting Officer within 10 after of the Task Order. Commencement of construction is contingent upon approval of required bonds. An electronic copy of your must be submitted with your proposal. A hard copy of your will be requested from the apparent awardee upon confirmation of their price and must be submitted to the PCO office within one (1) business day from time of request. Failure to submit an electronic copy of your with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration. Proposal Acceptance Period: Proposal acceptance period shall be 120 from receipt of offers. Estimated Budget Amount or Price Range: In accordance with FAR 36.204, Disclosure of the of Construction , the estimated price range for this project is between $1,000,000 and $5,000,000. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government requires completion of construction within 270 calendar after (includes 15 calendar for and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number: MD20230055 09/01/2023 applies to this work. (See Attachment B.) Should this wage determination be modified by DoL prior to , the most current wage determination will be incorporated at the time of . The wage determination version in effect at the time of shall apply to the work performed under this contract. 10/17/2023 at 2:00 PM ET via using the Excel document provided as Attachment D to William.s.bryan6.civ@us.navy.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.