Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

June 1, 2024

Nixon Lake Rd

Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Nixon Lake Rd, Land O Lakes, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Town of Plum Lake will be accepting bids for road repairs for a portion of Nixon Lake Road in Star Lake, which will include ditching and gravel work. Project is to be completed by June 1, 2024. The Town of Plum Lake reserves the right to accept or reject any and all bids. This project is contingent upon the Town receiving funding from the Wisconsin Department of Natural Resources. The Town of Plum Lake reserves the right to accept or reject any and all bids. This project is contingent upon the Town receiving funding from the Wisconsin Department of Natural Resources. The primary items of work under this contract consists of stripping shoulders, removing rocks, constructing ditches with breaker run stone, installing ditch check flumes, and furnishing and placing crushed aggregate base course. The work shall be executed under the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, Edition of 2020, and according to the current year State of Wisconsin supplemental specifications and the special provision specifications attached. The Town is responsible for locating and relocating property boundaries and right of way. The Town is responsible for moving or relocating utilities if required. The contractor is responsible for contacting Diggers Hotline. Crushed aggregate base course shall meet current WISDOT %", 1-1/4", or 1996 WISDOT Grade 2 specifications. Gravel if measured by the cubic yard will be based upon truck measure, or by the ton if specified. FINAL GRADING- When final grading the roadway the contractor is required to add water to the existing base course to bring roadway to optimum moisture content. It is required that the roadway be compacted with a vibratory roller. It is required that the contractor review the roads and work to be completed with a Town Representative prior to bidding, so both parties have a clear understanding of the work to be completed under this proposal. PROJECT START AT STATION 98+80 WHICH IS LOCATED 9,880' WEST OF THE NIXON LAKE ROAD AND CAMP 2 ROAD INTERSECTION. PROJECT END IS AT 188+56

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.