Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

November 15, 2023

No Information to Display

131 5th Ave

Renovation

No Information to Display

$84,000.00

Public - City

img_map_placeholder

131 5th Ave, Moline, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Questions about the project, specifications, gaining access to the project, or the bidding process may be directed to Christopher Day, Housing Construction Specialist, 309-524-2053. 1. The contractor and subcontractors must meet all applicable State, County, and/or City licensing requirements. The successful bidder will be required to comply with the program's insurance requirements at all times while performing contracted service work. 2. As part of bid preparation, contractors and subcontractors are encouraged to attend the walk-through scheduled for Thursday, October 5th at 10am CST. 3. Contractors must verify all measurements referenced in the work write-up. No Change Orders will be approved for measurements not verified at the bidding stage. 4. All work and materials must meet the City of Moline guidelines and applicable Federal, State and Local Codes; and must meet HUD and Illinois state requirements, including but not limited to employed lead-safe work practices. Upon executing the contract, the project (specifications) shall be successfully completed within thirty days of the executed contract date. 5. The Contractor's bid shall include all necessary labor, materials, tools, equipment, (all) permits, applicable fees, and all other items necessary to complete the project in conjunction with the project specifications. 6. The awarded contractor is required to comply with the Environmental Protection Agency (EPA) Renovation, Repair and Painting Rule (RRP) in homes built before 1978. All bids awarded after April 20, 2010 are also subject to RRP compliance requirements. All contractors shall submit a copy of their RRP training certificate with their bid.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.