Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 4, 2023

June 1, 2024

111 S Capitol Ave

Renovation

No Information to Display

$100,000.00

Public - State/Provincial

img_map_placeholder

111 S Capitol Ave, Lansing, MI

Subscribe to View Full Documents

The Work, includes, but is not necessarily limited to: New deck coating at the entire Terrace, removal and replacement of concrete topping at the north portion of the Terrace, installation of new wall limestone and flashings at the north portion of the Terrace, new EIFS ceiling at the Ground Floor drive area to the north, new hollow metal door and frame, new electrical snow-melt system, and new Terrace slab floor drains. Question Deadline 10/25/2023 at 3:00 PM ET All requests or inquiries concerning the Bidding Documents, or the Work must be addressed to: Ken Lemiesz, WTA Architects, klemiesz@wtaarch.com The Agency will provide the following Work: (a) State Salvage: The State reserves the right to salvage certain items and equipment and those salvaged items will be identified to the Bidder at the time of their inspection of the proposed Work. The State will remove salvaged items before commencement of the Work. (b) Moving Furnishings and Equipment: The Contractor must give timely notice to the State Agency representative identified in the pre-construction meeting of all furnishings, window covering and movable equipment that will interfere with the Work or which the Contractor cannot protect with coverings of paper, plastic, drop cloths or clean tarpaulin. The Contractor must furnish, install, maintain, and remove all coverings used to protect furnishings, window coverings and movable equipmen

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.