Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 2, 2023

November 1, 2024

Mathis Rd

Site Work

No Information to Display

$3,743,953.00

Public - State/Provincial

img_map_placeholder

Mathis Rd, Rock Hill, SC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The South Carolina Department of Transportation (SCDOT) is soliciting for Catch Basin Repair and Replacement on Mathis Road in Rock Hill. Per the specifications herein. This solicitation is exempt pursuant to 11-35-710 (1) ACQUIRE SERVICES The purpose of this solicitation is to acquire services complying with the enclosed description and/or specifications and conditions. MAXIMUM CONTRACT PERIOD - ESTIMATED Start date: 11/02/2023 End date: 11/01/2024. Dates provided are estimates only. Any resulting contract will begin on the date specified in the notice of award. See clause entitled "Term of Contract - Effective Date/Initial Contract Period". The South Carolina Department of Transportation (SCDOT) is soliciting for catch basin replacement and repairs on Mathis Road, Rock Hill. Per the specifications herein. This project will consist of the following: Pour 2-36" Concrete bases with rebar for each catch basin Build 2 catch basins from 4"x8"x16" brick. One (1) catch basin attaching to outlet of existing crossline going under Mathis Road. The other catch basin roughly ninety (90) feet west of first catch basin. Both box tops will have 18" eccentric cones with cast iron frame and cover. Installing roughly 90' of 18" RCP between the two (2) newly installed catch basins. Both boxes need to tie flush to existing ground elevation. Install roughly 24' of 18" RCP at western catch basin facing outlet toward the property line. Ditch roughly 20' towards natural ditch swell Place rip rap at outlet end of newly placed pipe Expose existing outlet side of crossline pipe Cost to include all ditching, backfill, grading, seeding, mobilization and traffic control. Question Deadline 10/18/2023 at 12:00 PM ET Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing. Questions regarding the original solicitation or any amendment must be received by the Procurement Officer no later than five (5) days prior to opening unless an earlier date is stated on the Cover Page A site visit will be held at the following date, time and location. Your failure to attend will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the State. The State assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available at the conference. Nor does the State assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.