Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 29, 2024

October 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,500,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Doylestown, PA

Subscribe to View Full Documents

This Project Will Involve the Construction of Approximately 1 Mile of 9-10 Wide Shared Use Path Along Burpee Road, North Shady Retreat Road and Limekiln Road (Sr 4007) in Doylestown Township. Structure Mounted Barrier Will Be Added to the Limekiln Road Bridge Over Pa Route 611 to Provide a Protected Area Across the Structure. Signal Modifications and Crossing Improvements Will Be Completed at the Intersections of Burpee Road and West State Street as Well as Limekiln Road and Hospital Road. New Crossings Will Be Added at the East Butler Ave and Burpee Road Intersection, as Well as the Intersections of North Shady Retreat Road With Chestnut Valley Drive and Old Colonial Drive. Ada Ramps Will Be Designed at All Crossings Within the Project Limits and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0000, Section Srt, in Bucks County, Doylestown Township From Approximately Sr 4202 at Segment 0121 Offset 1000 to Sr 4007 at Segment 0020 Offset 1077. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 21.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Shady Retreat SRTS Trail *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects