Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 6, 2023

January 3, 2024

September 12, 2024

Mountain Rd 109

Paving, Site Work

No Information to Display

$2,698,000.00

Public - County

img_map_placeholder

Mountain Rd 109, Porterville, CA

Subscribe to View Full Documents

General work description: The work to be done consists, in general, of replacing the existing bridge with a two-lane, three span, reinforced concrete slab bridge with cast-in-place columns constructed on spread footings. Other items or details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions must be performed, constructed, furnished or installed. Bidders may visit the project site. Bids are required for the entire work described herein. Submit the bidder's security in the form of cash, a bidder's bond, or a certified check or cashier's check, in the amount of ten percent (10%) of the amount bid or the bid will be considered nonresponsive Bidders are advised that, as required by federal law, the County of Tulare is implementing new Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprises (DBE). Section 2, "Bidding," under subsection title "Disadvantaged Business Enterprises (DBE)" and Section 5, "Control of Work" of these Special Provisions, cover the DBE requirements. The DBE Contract Goal is 15% This project is a Federal Aid project with an estimated project cost of approximately two million and six hundred and ninety-eight thousand dollars ($2,698,000). The Board of Supervisors reserves the right to reject any or all bids The Project is to be completed within one hundred & eighty-one days (181) working days from the date to be established in the NOTICE TO PROCEED. The County establishes a DBE Contract goal of 15% Technical questions should be directed in writing to Carlos Gonzalez at the Resource Management Agency, 5961 S. Mooney Blvd, Visalia CA 93277

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.