Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2023

November 10, 2023

April 8, 2024

202 Bell St

Renovation

No Information to Display

$100,000.00

Public - City

img_map_placeholder

202 Bell St, McMinnville, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Removal of all membrane roof, deck insulation and replacement of the same for the Water and Sewer Department Main Warehouse and workshop areas at 202 Bell Street McMinnville, TN 37110 consisting of: All flashing, curbs, gutters, drip edges or other items related to this roofing project are to be replaced with new materials of the same kind. Bids will be awarded based on lowest and/or best bid. The city reserves the right to reject any and all bids. Material for the roof itself shall be as follows: 1) Remove all roofing from metal decking. 2) Remove all rotten and deteriorated wood. 3) All metal decking will be inspected by the Water Dept Head and removed as deemed necessary. A price per linear ft Shall be included in the bid. 4. The old, deteriorated metal decking will be removed and NOT overlayed with new. 5. New decking will be 22 gauge or better with matching configuration as old. 6. Final product will be inspected before the ISO board is installed. 7. ISO board should be a minimum thickness of 2.6 (R15) and may require a higher R value, ALL to be mechanically attached. 8. Install new TPO 60 mill roof system over the new ISO board, mechanically attached, install Per manufacturer guidelines. 9. All penetrations, vents, pipe flashing must be installed per manufacturer specs. 10. There is a possibility of roof drains needing to be installed after the roof is completed to facilitate drainage across the roof. (Not to be included in the bid) 11. The roof edge will NOT terminate with standard flashing, but the roof will extend into the gutter and a termination bar attached around the perimeter of the building to secure the membrane. NO glue will be used in the roof replacement. 12. All debris will be cleaned up, loaded and removed from the property. 13. A 5% bid bond is required that will be redeemed if the bid is not honored. 14. A 100% performance bond is required when the bid is awarded to ensure the job is completed as specified. 15. Contractor to complete this project within 150 days of the bid award date.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects