Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

No Information to Display

509 Maple St

Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

509 Maple St, Birmingham, AL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Principal Items of Work related to this project are: Description Unit Amount Mobilization LS 1 Clean and Pre-CCTV Existing 36" Corrugated Metal Pipe (CMP) LF 37 Prep and Install Spray-In-Place Pipe (SIPP) Liner In Existing 36" Corrugated Metal Pipe (CMP) LF 37 Clean and CCTV Existing 24" Reinforced Concrete Pipe (RCP) LF 41 Traffic Control LS 1 The City of Birmingham reserves the right to reject any or all bids and to waive any informality in any bid As a matter of public policy, the City of Birmingham agrees to make opportunities available to the maximum extent possible, to actively include Historically Underutilized Business Enterprises (HUBE's) such as architectural firms, engineering firms, investment banking firms, other professional consultant services providers, and construction contractors as part of business, economic and community revitalization programs It is the bidder's responsibility to bid on the correct set of bid documents. Bids shall be accompanied by a cashier's check drawn on an Alabama bank, or a bid bond executed by a surety company duly authorized and qualified to make such bonds in the State of Alabama, in an amount equal to 5% of the bid (subject to a maximum of $10,000) and payable to the City of Birmingham. Bid bonds of the three (3) lowest bidders will be held for a period of ninety (90) days unless bidders agree, in writing, to a longer period of time. No bid may be withdrawn after the scheduled closing time for receipt of bids and for a period of ninety (90) days thereafter. A performance bond equal to 100% of the contract amount and a payment bond equal to 100% of the contract amount will be required of the successful bidder. Said bonds shall be executed by a surety company duly authorized and qualified to make such bonds in the State of Alabama Question Deadline 10/20/2023 at 5:00 PM CT

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects