Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 27, 2023
November 27, 2023
No Information to Display
1509 E Court St
Site Work
No Information to Display
$200,000.00
Public - County
1509 E Court St, Flint, MI
Reference Number 0000330959 Mott College is seeking a qualified contractor who has at least three (3) years familiarity with MCC campus to correct drainage issues at Mott's Family Life Center, located at 1509 East Court Street, Flint, MI, basement floor, located next to the main campus. Delivery Point Main Campus 1401 East Court Street Flint, Michigan United States 48503 Question Acceptance Deadline 10/20/2023 02:00 PM EDT Questions are submitted online Yes -- MCC's Procurement Ocer and Project Manager will be present to answer questions regarding the scope of work and intent of the solicitation. General Requirements - FOB Destination - Installation Required - Insurance Required - License Required Award Requirements - All or None Award Lupe Aguilar Email Address guadalupe.aguilar@mcc.edu This scope of work for this project includes, but may not be limited to, the following information, drawings, technical specifications, and other attachments. 1. Contractor must have and be able to demonstrate a minimum of five (5) of successful experience completing the same or similar projects and/or scopes of work. 2. Contractor must have a minimum of three (3) years of familiarity with MCC main campus. 3. Contractor will assign a competent project manager who has full authority to act for the Contractor and who will be MCC's primary point of contact and coordination during the execution of the project. 4. Each basin (new and existing) have been labeled on Appendix B that is attached to this ITB. 5. Basin "A" has an existing connection to Basin "B" - clean this line to assure flow from A to B. 6. Basin "A" is an existing drainage structure - clean out silt from existing structure. 7. Basin "B" is an existing drainage structure - clean out silt from structure, install two (2) new horsepower sump pump in existing structure, install new 2" pvc sump line underground from Basin"B' to Basin "C", add new 4" x 4" treated post with power receptacle adjacent to Basin "B" for new sump pump power connection, connect receptacle into the electrical panel inside the FLC building. 8. Basin "C," install new 24" x 36" plastic sump basin with lid, receive pumped 2" pvc line from Basin "B", install new gravity pitched 4" pvc pipe from Basin "C" to existing drain "D," connect to Basin "D." 9. Inside the North side basement: cut concrete floor and install 24" x 30" new plastic sump basin "F" with lid, cut 10' along wall (east and west) of the new basin and install 4" drain tile with sock and backfill with pea stone, install 6 mil visqeen and reinstall the concrete around the basin and over the tile trench area. Install a new power outlet for plugging in sump pump, install new 1 horsepower sump pump, install "2" pvc sump discharge line with check valve from Basin "F" up overhead and connect to internal storm pipe that leads to Basin "E." 10. Inside the South side basement: cut concrete floor and install 24" x 30" new plastic sump Basin "G" with lid, cut 10' along wall (east and west) of the new basin and install 4" drain tile with sock and backfill with pea stone, install 6 mil visqeen and reinstall the concrete around the basin and over the tile trench area. Install a new power outlet for plugging in sump pump, install new 1 horsepower sump pump, install 2" pvc sump discharge line with check valve from Basin "G" - Core wall, run drain underground to Basin "B," patch and seal the wall penetration. 11. The work is to be performed during traditional work hours. Traditional hours of work are Monday through Friday from 8 AM to 5 PM E.S.T. Service Providers who need to operate outside of this period must receive prior approval from the Project Manager at least twenty-four hours in advance to allow for the notification of the appropriate personnel at MCC. The Project Manager must be notified in advance if there are any additional costs associated with a request to work outside of traditional work hours. 12. The Service Provider, its subcontractors, and agents will abide by all federal, state, and local laws, rules, and regulations related to fair labor practices, prohibiting discrimination in employment, and controlling workplace safety.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Flint, MI
Bid Date: Nov 07 2023
Flint, MI
Bid Date: Nov 07 2023
Flint, MI
Bid Date: Nov 01 2023
Flint, MI
Bid Date: Oct 18 2023
Flint, MI
Bid Date: Jun 27 2023
Environmental Abatement and Disposal of Asbestos and Hazardous Materials and Demolition and Disposal
Flint, MI
Bid Date: May 10 2022
Flint, MI
Bid Date: Mar 04 2022
Flint, MI
Bid Date: May 10 2022
Flint, MI
Bid Date: Sep 25 2023
Flint, MI
Bid Date: Oct 18 2023
Genesee Career Institute (GCI) and Marion Crouse Instructional Center (MCIC) Fence Project - 5186496
Flint, MI
Bid Date: Oct 03 2023
Flint, MI
Bid Date: Jul 20 2021
Flint, MI
Bid Date: Oct 10 2023
Flint, MI
Bid Date: Jun 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
