Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$750,000.00

Public - City

img_map_placeholder

To Be Determined, Holly Hill, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project consists of furnishing all labor, materials, equipment, tools, transportation, services, and incidentals and performing all work necessary to construct AERIAL REUSE PIPE REPLACEMENT. Directions drill of approximately 250 LF of 10" reuse pipe to replace and existing aerial crossing. All work shall be complete, in place, and ready for service in accordance with the drawings and specifications prepared by Parker Mynchenberg & Associates, Inc. Question Deadline: 10/18/2023 at 5:00 PM ET.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.